Location: Hedley, BC
General Contractor: Dorosh Construction Ltd.
Scope: Installation of detour bridge and detour roadwork to connect detour bridge. Construction of a new 26m two lane bridge on spread footing abutments and box girder deck, complete new road structure on each side of the bridge.
Give Us A Call
Send A Message
Visit Our Office
1-20010 100A Avenue
Langley, BC V1M 3G4
about us
Our background comes from high-quality architectural concrete, from custom homes to terraced gardens and parks. Notable recent projects include Coquitlam Town Centre Park at Lafarge Lake, Empire Fields at Hastings Park and Queenston Park.