Carolin Bridge Deck Renewal

Location: Coquihalla Hwy 5, 21km east of Hope, BC 

General Contractor: Dorosh Construction Ltd.

Scope: Removal of existing deck concrete, construction of a reinforced fibre-reinforced silca fume and link slab over pier, raising of the superstructure by 85mm, replacement of all bearings including the reconstruction of bearing seats, modification to abutments, and paving of the bridge approaches.